• Shanghai Beyond Machinery Co., Ltd
    Erik Steen Hansen of Denmark
    I am the person, who has done the trials/production using the Pineapple crusher. So far the crusher has worked very well!
  • Shanghai Beyond Machinery Co., Ltd
    Director Gerelkhuu of Mongolia
    You are always welcome. Glad to work with your company and employees.
Contact Person : Caroline Wang
Phone Number : +86-13918793199

1000LPH 2000LPH 3000LPH Industrial Yogurt Making Machine With 100ml Plastic Cups Package

Place of Origin CHINA
Brand Name BEYOND
Certification ISO 9001/SGS/CE/TUV
Model Number BY-PM
Minimum Order Quantity 1SET
Price 100000USD-800000USD/set
Packaging Details export standard packing, worthy for long distance sea shipping
Delivery Time 60-100days upon the recipt of downpayment and confirmation of drawings
Payment Terms T/T, L/C, west union
Supply Ability 20 sets per month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Material SUS316 Capacity 1000-3000LPH
Yoghurt Type Industrial Type Package Type Roof Type Carton Packaging
High Light

yogurt production equipment

,

industrial yogurt machine

Leave a Message
Product Description

1000LPH 2000LPH,3000LPH yoghurt line, drinking yoghurt, set yoghurt with 100ml plastic cups package

 

Brief information:

Brand Name: Shanghai Beyond
Model Number: BY-YL
Capacity 5-200TPD
Raw material

Fresh cow milk, buffalo milk, goat milk, camel milk

or milk powder, or both mixed

End product Set yoghurt, stirred yoghurt, Lassie, Yakult
Shelf life 20-25days
Final product fat (%)

double toned milk (1.5%);

Full cream(3% or 6%); Semi-skimmed

SNF 8.5%(min)
Main material for machines SUS304 or SUS316
Package for end product plastic bag 
Certification: ISO9001/CE/SGS
Place of Origin: China
Manufacturer history More than 10years

 

Company introduction:

Shanghai Beyond Machinery Co., Ltd, established in the year of 2005, is a manufacture specialized technology-oriented machinery. BEYOND is able to provide the turn-key projects, including the design, manufacture, installation and commissioning for the production lines of liquid food such as dairy, drink, ice cream, fruit and vegetable, bio-engineering, chemical and pharmaceutical.

Cooperated with several domestic and abroad Light Industrial or scientific research institutions, we absorb their advanced technology and then take base to develop new even better process techniques, we are now specializing in all kind of sanitary stainless steel tanks, heater, cooler, sterilizer, concentrator, pump and other pipe and fittings.

 

Through the years of the common efforts of our staff, we have obtained high share in the market of machinery industry, and have developed ourselves into a medium-sized enterprise of certain popularity in the industry. Combining scientific research, technical development, production, marketing and after-sale service, we keep ourselves acting strictly in accordance with the quality assurance system of ISO 9001, to ensure us to provide the good quality equipments that are in accordance with the relative standards of Juice, Dairy, Pharmacy, bio-chemical, such as HACCP, QS and GMP etc.

 

Thank you very much for the trust of all our customers and we expect to build up good business cooperation friendship with more and more clients, and warmly welcome to your visiting to our factory!

 

Commercial terms

*Terms of Payment: 40% TT as down payment, the balance before loading,

or 100%L/C at sight against shipping documents ;

 

*Delivery time:

120 days after receive TT deposit or formal 100% L/C, upon approval on technical drawings and specifications by client.

 

*Duration of Guarantee:

 

1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.

 

2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.

 

3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.

 

*Installation terms:

1. 50-60 days for installation and commissioning.

 

2. BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.

 

1000LPH 2000LPH 3000LPH Industrial Yogurt Making Machine With 100ml Plastic Cups Package 01000LPH 2000LPH 3000LPH Industrial Yogurt Making Machine With 100ml Plastic Cups Package 11000LPH 2000LPH 3000LPH Industrial Yogurt Making Machine With 100ml Plastic Cups Package 21000LPH 2000LPH 3000LPH Industrial Yogurt Making Machine With 100ml Plastic Cups Package 3