-
Dairy Processing Plant
-
UHT Milk Processing Line
-
Industrial Yogurt Making Machine
-
Tomato Processing Line
-
CIP Cleaning System
-
Fruit Juice Processing Line
-
Mango Processing Line
-
Pineapple Processing Line
-
Orange Processing Line
-
Milk Pasteurization Equipment
-
Cheese Making Equipment
-
Butter Making Equipment
-
Stainless Steel Tanks
-
Fruit Processing Equipment
-
Apple Processing Line
-
Beverage Production Line
-
Multiple Effect Evaporator
-
Soft Drink Production Line
-
Meat Processing Machine
-
Erik Steen Hansen of DenmarkI am the person, who has done the trials/production using the Pineapple crusher. So far the crusher has worked very well!
-
Director Gerelkhuu of MongoliaYou are always welcome. Glad to work with your company and employees.
5000T/H SUS304 Fresh Liquid Pasteurization UHT Milk Production Line
Place of Origin | CHINA |
---|---|
Brand Name | BEYOND |
Certification | ISO 9001/SGS/CE/TUV |
Model Number | BY-UT |
Minimum Order Quantity | 1SET |
Price | 100000USD-800000USD/set |
Packaging Details | export standard packing, worthy for long distance sea shipping |
Delivery Time | 80-100days upon the recipt of downpayment and confirmation of drawings |
Payment Terms | T/T, L/C, west union |
Supply Ability | 20 sets per month |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | SUS304 Or SUS316 | Manufacturer History | More Than 10years |
---|---|---|---|
Voltage | 380V 50Hz/110V 60hz/415V 50Hz | Operator Needed | About 6-20persons |
Steam Consumption | About 300-5000T/H | Warranty | 12 Months After Commissioning |
Raw Material | Fresh Liquid Milk | ||
High Light | SUS304 UHT milk production line,5000T/H UHT milk production line,SUS304 uht pasteurization machine |
300-5000T/H UHT Milk Processing Line milk processing plant machinery
UHT ultra high temperature sterilization milk needs to use fresh and high quality milk source. After entering the production workshop, the special process of pretreatment is first carried out. The raw milk is heated to 75 ℃ in the sealed pipe to activate the bacteria in the milk, and the effect can be greatly improved when the ultra high temperature sterilization is adopted.
Description:
Shanghai beyond machinery co., ltd is specialized in supplying various kinds of milk processing line, including the pasteurized milk, UHT milk, flavored milk, yoghurt, cheese and butter, cream, condensed milk etc.
Shanghai Beyond can supply complete turnkey projects for customers, integrating with designing, equipment manufacturing, to installation and commissioning and also training the operators.
UHT milk process: milk transporting tank or vessels, milk filter and collection tank; cooling and storaging tank(milk chilly tank), Mixing/Blending and milk standardization, cream separation, UHT sterilizer(tubular type or plate type) homogenization, degassing, and filling
Brand Name: | Shanghai Beyond |
Model Number: | BY-UM |
Capacity | 5-200TPD |
Raw material |
Fresh cow milk, buffalo milk, goat milk, camel milk or milk powder, or both mixed |
End product | Pure milk, UHT milk, long shelf life milk |
Shelf life |
35-40days, 3months, 6months, 12months (keep at room temperature ) |
Final product fat (%) |
Semi-skimmed or double toned milk (1.5%); Full cream(3% or 6%); Toned milk(3%) |
SNF | 8.5%(min) |
Fresh milk inlet temperature | 4 ℃ |
Filling temperature | 20~30 ℃ |
Package for end product | plastic pouch / plastic bottle |
Certification: | ISO9001/CE/SGS |
Main material for machines | SUS304 or SUS316 |
Place of Origin: | China |
Manufacturer history | More than 10years |
Voltage | 380V 50Hz/110V 60hz/415V 50Hz |
Power consumption(Kw) | energy saving type, about 100-500kw, |
Operator needed | About 6-20persons |
Cooling water consumption | About 80-300M3 |
Steam consumption | About 300-5000T/H, |
Factory space needed | About 500-5000Sqm |
Warranty | 12 months after commissioning |
After sales service | Engineers available to service machinery overseas |
Minimum Order Quantity: | One set/one line |
Price: | negotiation |
Payment Terms: | T/T or L/C |
Supply Ability: | 50 Sets Per Season |
Delivery Time: | 50-100 working days upon receipt of payment and confirmed the drawings |
Packaging Details: | PE film wrapping, or carbon steel frame packing, or wooden case packing as to clients’ requirement |
Warranty | 12 months after commissioning |
After sales service |
Engineers available to service machinery overseas |
Part of the Projects list or reference:
Project information | Place | Remark |
5000L/H UHT milk production line | Zimbabwe | Turnkey Project |
300 t/D liquid dairy production line | Henan Luohe | Turnkey Project |
100 t/D whole factory removal renovation project | Zhejiang Quzhou | Turnkey Project |
500 t/D dairy production line | Hubei Huanggang | Turnkey Project |
100 t/D liquid milk production line | Inner Mongolia JiNing | Turnkey Project |
400 t/D liquid milk production line | Xinjiang urumqi | Turnkey Project |
100 t/D dairy production line | Anhui huaibei | Turnkey Project |
200 t/D liquid milk production line
|
Shandong ZaoZhuang | Turnkey Project |
1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.
2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.
3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .
4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .
5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.
6) Q: I haven't done business with you company before, how can I trust your company ?
A: Our company has been in Alibaba.com for 14 years, which is longer than most of our fellow suppliers, we have been golden suppliers for years. What ' s more, we have got quite a lot authority certificates, for example, CE, ISO9001, Alibaba onsite check certificate.
7) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.
8) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.
9) Q: Do you give any Discount?
A: I will surely try my best to help you get those by the best price and good service at the same time.